Reconstruction of 10 miles of two lane frontage road with open ditches. Responsible for drainage design and SW3P. Developed drainage area maps and hydrologic models (HEC-RAS, THEISIS) for cross culverts. Designed proposed ditches and storm sewer system for entire corridor.