Hydrology & Hydraulics

South Central Cement

South Central Cement Houston,TX This 12 acre site is located at the confluence of the Houston Ship Channel and Greens Bayou and is used to transport cement and other products via cargo ships. RG Miller | DCCM was retained to provide a detention and flood plain mitigation analysis as well as to develop construction plans that would

South Central Cement Read More »

Low Impact Development Design Evaluation for Bellaire Blvd Improvements

Low Impact Development Design Evaluation for Bellaire Blvd Improvements Fort Bend County,TX RG Miller | DCCM, in association with Asakura Robinson, prepared preliminary engineering designs, landscape designs, and cost estimates for a 2,800 foot segment of Bellaire Blvd near Mason Road. Designs and cost estimates were developed for a traditional curb and gutter drainage system

Low Impact Development Design Evaluation for Bellaire Blvd Improvements Read More »

Cypress Rose Hill Road

Cypress Rose Hill Road Cypress,TX Reconstruction of Cypress Rose Hill in northwest Harris County from a 2-lane asphalt open ditch section to a 4-lane concrete boulevard with side swales, storm sewers and two detention basins. The new road was designed to have the same Level of Service during extreme events as the existing road as

Cypress Rose Hill Road Read More »

Willow Trace

Willow Trace Harris County,TX The Willow Trace development covers 134 acres of land on Boudreaux Road in the northern portion of Harris County. The storm water drainage portion of the Willow Trace project involved the design of a three-basin storm water detention system, a pump installation to empty the lower (deeper) portion of the detention

Willow Trace Read More »

Freeport Street, Phase I

Freeport Street, Phase I Freeport,TX Reconstruction of Freeport Street from Woodforest to Uvalde including additional storm sewer/upgrading of storm sewers to alleviate occurrence of 1% (100-yr.) flooding in the neighborhood area. Project work also included the rework of numerous HCFCD Channels and Street Culvert Crossings to also convey the various storm events more efficiently. Included

Freeport Street, Phase I Read More »

Birnamwood Drive

Birnamwood Drive Harris County,TX RG Miller | DCCM was retained to plan and design flow monitoring and stormwater sampling facilities to monitor the hydraulic and pollutant removal performance of the first low impact development (LID) roadway constructed in Harris County. The roadway is located in the Spring Creek watershed and features a depressed center median with

Birnamwood Drive Read More »

Freeport Street, Phase II

Freeport Street, Phase II Freeport,TX Reconstruction of Freeport Street from IH 10 to Holly Park from an existing 2-lane asphalt pavement with open ditch/small lateral culvert system to 2-lane with continuous left turn lane, concrete curb and gutter and storm sewer system. Storm sewer system included three offsite systems, a new HCFCD concrete low flow

Freeport Street, Phase II Read More »

Wetlands and Stream Mitigation Bank Feasibility Study (Fort Bend County)

Wetlands and Stream Mitigation Bank Feasibility Study (Fort Bend County) Fort Bend County,TX RG Miller | DCCM prepared a feasibility study to determine if the development of a mitigation bank should be pursued, alone or in concert with a partner organization.  The study researched and determined the anticipated supply and demand of stream and wetland credits

Wetlands and Stream Mitigation Bank Feasibility Study (Fort Bend County) Read More »