Portfolio

Highlands Siphons

Highlands Siphons Baytown,TX The North Main Siphon consisted of one 42-inch reinforced concrete (RCP) siphon pipe with supporting headwall structures at each end. This existing 42-inch RCP siphon was extended downstream by 60 linear feet to accommodate the expansion of North Main Street pavement widening project by the Harris County Public Infrastructure Department (HCPID) and […]

Highlands Siphons Read More »

FM 2100, CSJ 1062-02-009, TXDOT Houston District

FM 2100, CSJ 1062-02-009, TXDOT Houston District Houston,TX Reconstruction of a two-lane undivided rural section with open ditches to a 5 lane urban section with shoulders. Total length of project is 9 miles. Responsible for preparing typical sections, earthwork cross-sections, roadway geometric design, superelevation design, and hydraulic analysis of roadside ditches using HEC-RAS software.  

FM 2100, CSJ 1062-02-009, TXDOT Houston District Read More »

Loop 494, CSJ 0177-14-010, TXDOT Houston District

Loop 494, CSJ 0177-14-010, TXDOT Houston District Houston,TX Project limits from Kingwood Drive to Sorter-McClellan Rd. The total length of the project is 1.3 miles. Reconstruction of an existing two-lane undivided rural roadway to a four-lane divided rural facility with open ditches. Developed roadway geometric design and proposed roadway cross-sections. Designed storm sewer system and

Loop 494, CSJ 0177-14-010, TXDOT Houston District Read More »

Beltway 8, CSJ 3256-04-010

Beltway 8, CSJ 3256-04-010 Houston,TX Responsible for schematic review and Major Roadway Design P.S.&E. Preparation of a 5.5 miles, new location 6-lane curb and gutter divided roadway with four (4) each frontage road stream crossing bridge structures. The project scope included preparation of cross-sections for earthwork determination, roadway and bridge layouts, hydrologic study coordination with

Beltway 8, CSJ 3256-04-010 Read More »

US 90A

US 90A Harris County,TX $35 Million Project Reconstruction/expansion of existing “open ditch” roadway to 8-lane divided facility Traffic Control Plans TxDOT Houston District, Fort Bend County

US 90A Read More »

Westpark Toll Road (Section 14), Harris County Toll Road Authority

Westpark Tollway, Extension Project E5, Harris County Toll Road Authority Harris County,TX Responsible for one (1) mile 4R P.S.&E (in conformity with TxDOT Part IV Design Manual, Hydraulics Manual and TxDOT specifications) new location, controlled access 4-lane urban toll road including right-of-way constraints, overpasses, ramps, and multi-phase TCP. This project included an extended ramp over

Westpark Toll Road (Section 14), Harris County Toll Road Authority Read More »

Scroll to Top